IFB009SPRC17C AMENDMENT TWO2
Department of Property & Procurement Puce : . . = Government of the United States Virgin Islands [ e 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 ro ig 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 o ae : ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ood ST. CROIX FAX: 340.773.0986 I ST. THOMAS FAX: 340.777.9587 HTTP://DPPVI.GOV AMENDMENT ONE (2) March 23, 2017 TO: SUBJECT: IFBOO9SPRC17 (C) Construction of the Recreational Center in the Community of Estate Barron Spot, Christiansted, St. Croix. INSERT: Questions & Answers & Revised Bid Sheet Dated March 22, 2017 DELETE: Old Bid Sheet Dated February 23, 2017 Q. What type of windows will be installed in the building? A. All windows shall be awning windows with high impact glass and built-in burglar bars. The change will be made in the revised scope of work. Q. What type of tiles will be installed in the Community Center? A. Ceramic tiles shall be installed with a non-skid surface. Color will be selected by the owner RFP-017-2016 (P) Amendment Two (2) Q. …
Download the original document · Plain text (TXT) · Browse the archive · How this archive works
Original source: https://dpp.vi.gov/wp-content/uploads/2017/03/IFB009SPRC17C-AMENDMENT-TWO2.pdf
SHA-256 fff752e1c072cfa28620a972ee934bc3568d99010baac0d3db4b82def9e1eba6
Re-using this document
A public record of the Government of the Virgin Islands, published by the agency itself. No copyright is asserted on it and 17 U.S.C. § 105 does not reach territorial government, so it publishes as a territorial public record.
Our description, tagging, arrangement, extracted text and machine transcripts are released under CC0 1.0. We assert nothing about the document itself.
Archive identifier LF-fff752e1c072
Document text
Department of Property & Procurement Puce : . . = Government of the United States Virgin Islands [ e 3274 ESTATE RICHMOND, CHRISTIANSTED, U. S. VIRGIN ISLANDS 00820 ro ig 8201 SUB BASE, SUITE 4, ST. THOMAS, U. S. VIRGIN ISLANDS 00802 o ae : ST. CROIX MAIN OFFICE: 340.773.1561 | ST. THOMAS MAIN OFFICE: 340.774.0828 ood ST. CROIX FAX: 340.773.0986 I ST. THOMAS FAX: 340.777.9587 HTTP://DPPVI.GOV AMENDMENT ONE (2) March 23, 2017 TO: SUBJECT: IFBOO9SPRC17 (C) Construction of the Recreational Center in the Community of Estate Barron Spot, Christiansted, St. Croix. INSERT: Questions & Answers & Revised Bid Sheet Dated March 22, 2017 DELETE: Old Bid Sheet Dated February 23, 2017 Q. What type of windows will be installed in the building? A. All windows shall be awning windows with high impact glass and built-in burglar bars. The change will be made in the revised scope of work. Q. What type of tiles will be installed in the Community Center? A. Ceramic tiles shall be installed with a non-skid surface. Color will be selected by the owner RFP-017-2016 (P) Amendment Two (2) Q. What type of counter will be installed on the cupboard? A. All cupboards countertop shall be Formica. All other terms and conditions remain the same. A copy of this amendment must be returned with your bid. GOVERNMENT OF DIVISION OF ENGINEERING PUBLIC WORKS DEPARTMENT 6002 Estate Anna’s Hope Christiansted, St. Croix, V.1. 00820-4428 THE VIRGIN ISLANDS OF THE UNITED STATES Tel: (340) 773-1290 Fax (340)773-8865 |PROJECT : Scope of Work for the Construction of the Barren Spot Community Center |DATE: March 22, 2017 IPREPARD BY: Eran Flemming Revised ITEM DESCRIPTION OF WORK UNITS QUANTITY UNIT COST COST sf Mobilization Lump Sum 1 Construction of Cistern(21'Lx17Wx10) to include all 2 excavation, concrete, masonry units, forms manhole each 1 with covers and Theroseal Structural concrete slab (4000 PSI), in place, spread 3 | footing, including excavation of site, form, reinforcing C.Y 24 steel, vapor barrier and finishing Structural concrete(4000psi) column in place, include 4 . . eiaed Cy 4 forms, reinforcing steel and finishing Structural concrete (4000psi) in place for bond beam, to 5 . P ai CY 12 include reinforcing steel, form and finishing Concrete block, interior, tooled joints both sides, normal 6 = |weight, 2000 psi, 6"x6"x16", include motar and each 1400 horizontal joint reinforcing every other course Concrete block, exterior, tooled joints both sides, 7 _|normal weight, 2000 psi, 8"x8"x16", include motar and each 1500 horizontal joint reinforcing every other course 8 = [Concrete finishing, walls, float finish for entitire building S.F 6000 9 Paints & coatings building walls (concrete), primer and 2 SF 5800 coats, smooth finish - latex Paint 10 Paints & coatings ceilings (wood), primer and 2 coats, SF 2100 smooth finish - oil base paint 1 Hip Roof on wood frame with galvalume roofing panels SF 1650 26 gauge 12 ‘|Installation of Cove base (1x4) L.F 250 Purchase and installation of solid, birch, 1-3/8x6'- 13 8"x3'wide doors to include all frames, molding, lockset each 5 and hardware. Door and molding shall be sanded and 14 _‘|Installation of molding to encase door frames L.F 120 15 Installation of metal door (1-3/4"x3'x6'-8"high) , to each 3 include all frames, locksets and hardware Purchase and installation of awning comercial 16 Jaluminum window (4x3') with high impact glass and each 6 |_ built-in burelar bars Purchase and installation of awning commercial 17 [aluminum window (3x3') in kitchen with high impact each 2 4 Purchase and install 3x2, 5/8” awning commercial 18 Jaluminum windows with high impact glass and burglar each 4 throom 19 Installation of non-skid ceramic floor tiles. Color will be SF 1350 chosen winner Electrical wiring to include incoming service with meter base, running of all electrical conduit and 20 Aan . . 5.F 1350 wiring. Installation of outlets, switches and panelboard per electrical plan for entire building 21 ‘| Installation of Data & Telephone lines each 6 Purchase and installation of wall mounted LED 22 a each 4 exterior lights (150 watts) 23 Installation of 180 CFM exhaust fans with light each 6 fixture and duct to the exterior of building LED, ceiling mounted parabolic light fixtur 24 a & P = 8 8s each 10 (2'x2'). Three bulbs per fixture. Purchase and Installation of new LED Emergency 25 Jexit lights, 2 watt, wall and ceiling mounted, each 2 double face 26 Installation of restrooms wall tiles (8"x8"). Color will be S.F 600 chosen by owner __ 7 Purchase and installation of aluminum stock gutters, 6 LF 160 round 28 |down spout, 3" diameter L.F 40 construction kitchen base cabinets, hardwood 24" 29 |deep 35" high with back splash with formica top L.F 14 truction of kitche cabinet, 12" wide 30 pian ntop LF 17 plastic laminated. Purchase & installation of counter top lavatories, 19" round, single bowl, vitreous china lavatory for the vanity 31 |cabinet in restrooms, including all caulking around the each 4 perimeter of the lavatory and fittings. 32 Purchase and installation of self closing polished chrome each 4 faucet in the restrooms. 33 Purchase & installation of new surface mounted liquid each 4 soap chrome dispenser in restrooms 34 Purchase ahd installation of 5" stainless steel shelf, earl 7 48"x24" mirror in restrooms 35 ao a installation of stainless steel paper Towel seh 2 i} 36 Purchase and installation of stainless steel doule toilet each 4 paper dispensers 37 Purchase & Installation of new floor mounted commercial water closet. To include flushometer assembly. each 38 Installation of building water supply lines 1/2" and 3/4" lines per plumbing plan including the connection to the cistern L.S 39 Purchase & installation of 20 gallons water tank with water pump L.S 40 Installation of Septic System (Tank - 6'x10'x7') to include drain field and waste line for bathroom L.S 41 Partitions and doors for four (4) restroom stalls. Aluminum finish. Please refer to plans for configuration LS 42 Purchase & installation of a handicap grab bars 36" (1-1/4" diameter, stainless steel) for ADA restrooms one piece in each respective restroom. each 43 Purchase & installation of handicap grab bars 42" (1- 1/4" diameter, stainless steel) in restrooms. one piece in ami hier EL each Duration -- 120 calendar days Total Cost of the Project is Licensed Contractor Note: The undersigned Contractor acknowledges that the quantities included on the Bid Sheet are estimated values. It is the Contractor's responsibility to ascertain that the required material and quanties are included in the Bid Sheet in the event that there is a descrepency between what the Contractor estimates is required to complete said project. Any descrepancies in values or material required must be identified at the time of the Pre-Bid meeting. Once the contract is executed, the Contractor will be required to complete the project based on selected bidder's contractual agreement cost. pmihy FLE2//F LUbLIG WURKS UEPARTMEN, ST. CRODt {ARGH ISLANDS